An airport’s guide to the resource management reforms

The Resource Management Act is being replaced with a new, two-part framework made up of the Planning Bill and the Natural Environment Bill. Together, they are intended to create a more directive, plan-led system, with clearer national priorities and less reliance on repeated case-by-case decision-making.

We’ve written this article to help you grasp the proposed changes. It’s not an exhaustive evaluation – more to come on that in the new year – but we hope it will help you think about this major system change and what it will mean for your role in the airport sector.

Let’s start by looking at what is covered by each Bill.

The Planning Bill

The Planning Bill sets the framework for how land is used and developed. Its purpose is to enable the use and development of land in a way that supports economic growth, housing, and infrastructure, while managing conflicts between incompatible activities.

In broad terms, the Planning Bill is intended to:

  • enable development and land use that meets current and future demand
  • ensure land use does not unreasonably affect others, including by separating incompatible uses
  • plan and provide for infrastructure that supports communities and the economy
  • give effect to national priorities through a more directive, plan-led system

That last point is perhaps the most critical theme across all the reforms. The Bill is designed to be more directive than the RMA. Decisions are intended to narrow as they move down the system, with a strong emphasis on resolving trade-offs early and reducing re-litigation in individual consent applications.

It is important to note that while the Bill recognises land use compatibility as a planning objective, protection for airports will depend heavily on how this is translated into national direction and regional and local plans. More on that shortly.

The Natural Environment Bill

The Natural Environment Bill focuses on protecting and managing the natural environment by setting environmental limits.

Its focus includes:

  • establishing binding limits for environmental outcomes, including human and ecosystem health
  • managing effects on air, water, biodiversity, and coastal environments
  • shifting environmental trade-offs into plans rather than individual consents
  • creating a framework for allocating and managing natural resources within limits

This Bill draws a clearer line between enabling development and protecting the environment, by requiring environmental outcomes to be defined up front rather than negotiated project by project.

For airports, the Natural Environment Bill will influence how environmental effects are assessed and managed. Airports already operate within technical and environmental constraints. The key issue will be whether limits are set and applied in a way that recognises the operational realities and national importance of airport infrastructure.

How the two Bills work together

The two Bills are designed to operate as a single system. The Planning Bill determines where and how development occurs, and the Natural Environment Bill determines how environmental effects are managed.

Under both Bills, the government will issue national instruments to make clear the government’s priorities in the planning system. These national instruments take two forms. National policy directions will direct the outcomes and actions that need to be included in plans. There will also be national standards to complement these directions, which will include environmental limits and standardized zones. These will be used to simplify practices across the country.

The practical outcomes for airports will very much depend on how these national instruments are developed. One key example is the transition of the (still draft) National Policy Statement on Infrastructure, which should transition into the new system as a national instrument.

Regional combined plans

Plans will matter more than ever.

Under the new system, each region will have one combined plan, made up of a package of integrated components. First, one regional spatial plan will set the long-term strategic direction for the region. This is prepared by all councils in the region. There will be 17 of these.

Then, land-use plans and a natural environment plan are developed by councils. These must follow national instruments and give effect to the regional spatial plan, translating that strategy into regulatory rules.

Together, these components replace the regional and district plans that exist under the RMA and operate as a single, integrated planning framework for each region.

Regional spatial plans are intended to be the long-term strategic blueprint for each region with a 30-year outlook. They should:

  • identify where growth should occur and where it should not
  • identify existing and future infrastructure networks and corridors
  • signal how land use, transport, housing, and infrastructure fit together
  • provide a framework that the lower-level plans must give effect to

Airports have long embraced the practice of master planning, so the idea of these long-term spatial plans will be very familiar and is something we have advocated for. We will need to consider how airport master plans, with their focus on scenarios (due to stakeholder consultation requirements, master plans provide an outlook but not a commitment to investment), and capital plans, can best inform regional spatial plans, and vice versa.

For airports, spatial plans are where we would hope to see:

  • the airport’s role in the regional system acknowledged
  • future airport growth and expansion areas identified
  • surrounding land uses framed as compatible or incompatible.

There will be a range of land use plans at local/district level to give effect to the regional spatial plan. For airports, we would expect noise contours should be part of the regional spatial plan, but we would expect to see those noise contours then embedded in the planning rules of the multiple land use plans.

Together, the regional spatial plan and the land use and natural environment plans that give effect to it are referred to as the combined regional plan.

Because the system is more directive, the opportunity to fix problems later is reduced. Once plans are in place, there is intended to be less scope for challenge and change. This makes early engagement critical. Airports need to be visible and well understood at the regional spatial plan stage.

Next, let’s look at some other themes that will be top of mind for airports.

Reverse sensitivity and protecting airport operations

Reverse sensitivity, where new or intensified land use constrains existing airport operations, remains one of the most significant risks facing airports under any planning system. Noise complaints, pressure for curfews, restrictions on flight paths, and limits on future development rarely arise from airport activity changing. Rather, they arise because incompatible activities are allowed to establish or intensify around airports.

The new resource management system has the potential to improve this, but only if airport needs are clearly embedded at the right levels of the system.

The Planning Bill introduces a more directive, top-down approach to land use planning. National priorities are intended to be set early and carried through into spatial plans and combined regional plans, rather than being re-argued through individual resource consents.

The Bill’s objectives include recognition of land use compatibility, which is excellent to see prominent and upfront. However, reverse sensitivity is not specifically addressed. This means we will depend on national instruments to provide more specificity and direction on reverse sensitivity, how spatial plans should identify and protect infrastructure corridors and airport environments, and how combined regional plans should manage land use around airports. The intention is there, but it needs to be carried through.

Consenting and designations

With the system resolving more trade-offs upfront, there will be fewer matters left to be argued at the resource consent stage. This will result in a more targeted, risk-based consenting system, where low-risk activities are less likely to require consent.

If airports are well provided for in combined plans, fewer airport activities should require resource consent, consents that are required should be narrower in scope and faster to process, and there should be less scope for re-litigation of settled issues.

However, the flip side is important. If airports are not clearly recognised and protected in plans, consenting becomes harder. The ability to fix problems later through consents or appeals is deliberately reduced.

The reforms signal a stronger role for designations to be identified and supported through spatial plans, aligned with regional infrastructure strategies and less vulnerable to repeated challenge once established. Where the ‘strategic need’ for a future designation has already been identified through a spatial plan, then that will not need to be relitigated at the ‘proposed designation’ stage.

Environmental limits and infrastructure pathways

Environmental limits sit at the heart of the new system. Under the Natural Environment Bill, central government will set national limits to protect human health. Regional councils will set limits for air, freshwater, coastal water, land and soils following nationally directed methods.

The system is designed so that environmental trade-offs occur at the planning stage, rather than through ad hoc consent decisions.

The legislation also includes an infrastructure pathway for activities that are essential and cannot reasonably be located elsewhere, even where they may exceed certain limits.

For airports, environmental limits will influence how operational effects are assessed and monitored, how future development interacts with environmental bottom lines and what evidence is required to demonstrate compliance.

Importantly, airports are not starting from zero. Noise management, stormwater, wildlife and biodiversity management are already governed by technical standards, modelling, and monitoring frameworks. Airports will be well placed to support the national and regional consideration of environmental limits and where infrastructure may need specific dispensation.

Reduced scope for submissions and objections on consents

A clear feature of the new system is a reduced scope for contesting individual consent applications.

Key changes include:

  • a narrower definition of what constitutes a relevant “effect”
  • explicit exclusion of certain effects from consideration, such as trade competition and most amenity effects
  • fewer opportunities for public notification

The intent is to reduce re-litigation of issues that should have been resolved through plans, and to make consenting faster and more predictable.

Airport consents that are consistent with plans should face fewer objections. However, this change reinforces that consistent theme across the reforms: the ability to influence outcomes moves upstream. If issues are not resolved through national direction, spatial planning, and combined plans, airports should not rely on consent processes to correct them later.

Communities and interest groups that previously relied on consent submissions may redirect their energy into plan-making processes, political advocacy and pressure on councils outside formal consenting pathways. This makes early, transparent planning engagement even more important for maintaining social licence.

Regulatory relief for landowners

The new system introduces regulatory relief mechanisms for landowners whose ability to use their land is significantly restricted by certain planning controls. In broad terms, councils may be required to provide relief where planning provisions restrict land use due to significant historic heritage, outstanding natural landscapes or features, areas of high natural character and sites of significance to Māori.

Relief mechanisms may include rates reductions, alternative development rights and financial compensation. The intent is to discourage overly restrictive planning provisions by making councils more conscious of the cost of imposing them.

Importantly, the legislation does not apply regulatory relief to all planning tools. Some controls, including designations and natural hazard provisions, are expressly excluded from relief requirements.

This is an important concept to monitor through the reform process, but based on the announcements from the government so far, it should not have implications for the airport sector.

Our reflections

Reforming the RMA is perhaps the biggest job in policy and politics.

Setting the primary legislation is a critical milestone, but it is only the first stage in building a functioning system.

The new legislation establishes a clear architecture and a strong point of view about how planning should work. It is explicitly pro-growth, more directive, and more willing to prioritise infrastructure and economic outcomes. Both the Planning Bill and the Natural Environment Bill are designed to push hard decisions upstream and reduce the scope for incremental challenge later.

The practical outcomes will be shaped by national instruments, the quality of spatial planning, the capability of councils, and the way decisions are translated into plans and rules on the ground.

How airports are treated through the next phases of implementation will be an important litmus test of whether the system delivers on its intent. Airports sit in a category of infrastructure that is widely acknowledged as critical to regional and national wellbeing, but they remain politically and socially exposed because their effects are experienced locally and personally.

Airports are pro-growth and enable growth. At the same time, they are often expected to absorb the long-term consequences of poor land-use decisions made around them, sometimes decades after those decisions occur, with no realistic ability to reverse them.

As we look at the feedback we need to provide to the Select Committee process, we also need to understand that the new system is a call to action. How will we need to work within the system to make it successful and deliver the quality planning that we hope for? The reforms create the conditions for better outcomes for airports, but they will not secure those outcomes automatically. The system will only deliver if airport needs, constraints, and long-term planning realities are clearly articulated and embedded as the system is built.

In that context, airports are well placed. They are experienced long-term planners. They routinely:

  • plan over 30 year horizons
  • integrate land use, transport, safety, and environmental considerations
  • balance local effects with regional and national benefit
  • engage with communities, councils, and regulators on complex trade-offs

These are exactly the capabilities the new system relies on, and they are strengths our sector, alongside council owners and partners, should actively bring to the table.

Individual airports will need to reflect on what the new planning ‘funnel’ means for their engagement from next year. At the same time, we should consider how the role of NZ Airports will need to evolve, as more issues are resolved through national direction and system-level decisions.

What stays the same for now

The Bills still need to go through the parliamentary process. After that is complete, the shift to the new system won’t happen immediately – but preparation will begin in earnest.

For the near term:

  • the Resource Management Act continues to apply
  • existing resource consents, designations, and plan provisions remain in force
  • consent applications can continue to be lodged and processed under current rules

The reforms are not designed to invalidate existing approvals or force people into early renewal or redesign of established operations.

Transition timeframes and key milestones

The transition to the new planning system will be phased, with the system expected to be fully operational by 2029. Key milestones signalled by the Government are as follows.

  1. Legislation and immediate transition measures (2025–2026)

Once the Planning Bill and Natural Environment Bill receive Royal Assent:

  • urgent legislation will extend resource consents that are expiring or stuck in RMA processes
  • most consents will be extended until around 2031, being two years after the end of the transition period
  • new consent applications can still be lodged and processed under an amended RMA framework during transition

These measures are designed to ensure that consent holders are not forced into unnecessary renewals or disadvantaged while the new system is established.

A transitional consenting regime will begin one month after Royal Assent, allowing some elements of the new system to influence consenting earlier, while councils continue to operate under modified RMA processes.

  1. National direction is set first (2026–2027)

The Government has been explicit that the system will be built top-down. National instruments will be delivered in two main stages:

  • First suite (by late 2026): national policy direction under both Bills, early environmental limit instruments, standards for regional spatial plans, and some national rules for the transition period
  • Second suite (during 2027): more detailed national standards, including standardised plan content, zones, and environmental limits

Some existing national direction under the RMA will be repurposed where possible, rather than rewritten from scratch.

  1. Spatial plans and combined plans (from 2026 onwards)

Once national direction is in place, regions will begin preparing regional spatial plans. These will be followed by combined regional plans, replacing current regional and district plans.

During transition, councils must have regard to spatial plans once decisions on them are made. Planning and consenting processes will increasingly align with the new system, even before it is fully switched on.

The transition period ends when the Minister makes an Order in Council confirming that all plans are notified. At that point, the full new system takes effect and consenting moves entirely under the new legislation.

The airports that benefit most from the reforms will be those that are ready when the planning work begins in 2026.

Further reading and engagement

We highly recommend looking at the Ministry for the Environment’s website, which has easy to absorb content on all the components of the new system. We will share information on any outreach we are aware of in the new year, particularly around the regions.

We also recommend checking out Russell McVeagh’s initial assessment of the legislation here.

NZ Airports will be providing full submissions on the Planning and Natural Environment Bills. We welcome any airports or corporate members who would like to support this process through the NZ Airports Planning Working Group. Reach out to Billie to get involved – any input, small or large, is extremely valuable to us.